![](https://pekabex.com/wp-content/uploads/2022/01/IMG_20220330_111927-scaled.jpg)
Novol – hall in Włocławek
Assembly of a production hall in Włocławek. A geometrically complex facility tailored to the technology requires approximately 2.5 months of work with two cranes. The scope includes nearly 1,400 elements, of which approximately 500 are walls.