The design of City Stadium in Bielsko Biała assumed realization of an object for over 15,000 spectators. Pekabex has been selected for manufacturing, delivery, and installation of prefabricated reinforced concrete stadium structure, located in strict city centre. Realization started in August 2012 and its end is planned for the 2nd quarter of 2015. Pekabex has manufactured and installed 1,950 prefabricated auditorium elements of total volume of 1,930 m3.