Construction project of logistic centre for Wittchen was realized from April to December 2010. The hall area is 5,218 m2 and its volume 58,630 m3. The hall is 39.9 m wide, 126 m long, and 12 m high. Range of works realized by Pekabex included object structure (earth works, monolithic works, prefabricated reinforced concrete and steel elements), roof, casing, floor, water, sewage, and central heating systems, external networks, roads, and surrounding area.