Pekabex has realized complex works during construction of Samsung factory in Wronki – from earth works, through monolithic works (foundations, docks, concrete overlay), to the installation of steel structure. In range of prefabricated structure Pekabex has realized and installed 267 elements of total volume of approx. 468 m3. The prefabricated structure included columns, beams, girders, ground beams, and docks. The area of the whole object is approx. 5,000 m2.