Extension of the second NGK Ceramics Polska ceramic filter plant.
Construction of the factory at ul. Jana Gutenberg 14 in Gliwice, took place from mid-October 2014. until mid-January 2015 The scope of our work included design, production, delivery and assembly of a prefabricated structure. In total, we installed over 1,300 prefabricated elements with a total volume of over 2,500.00 m3. A particular challenge in this investment was the production, delivery and assembly of 20 pieces of over 25 meters high poles of the production hall, which weighed over 35 tons each. The prefabricated staircases that we made on this site also deserve attention.