The structure which we are especially proud of is Filborna power plant in Helsingborg in Sweden. Total number of prefabricated elements manufactured, delivered, and installed by Pekabex was 4,108 pieces, and their repeatability was very low. Total volume of the structure was 6,840 m3. Installation of that very complicated structure lasted continuously for 13 months with works realized at large heights.
Efficient operation of the design department, very complicated design, and realization of hanging staircases were the biggest challenges in that project. We have designed and installed those prefabricated elements. The elements have been perfectly fitted which for 45-metre hanging staircase is a success of designers, producer, and installers.